Skip to main content
Loading…
This section is included in your selections.

A. Monthly water service shall be furnished at the following rates:

Water Service Monthly Rate

7/1/2012 - 12/31/2013

Current Rate Effective 1/1/2014

Metered per 1,000 gallons

$8.48

$9.12

Minimum per month

$42.39

$45.57

B. Bulk water sales shall be subject to the prior approval of the water utility operator, and shall be metered and furnished at the rate as described in subsection (A) of this section; in addition, the following applies:

1. Hydrant Use. A deposit of $500.00 is required for hydrant bulk water use. A rental rate of $260.00 per month shall be charged for a hydrant meter and backflow prevention device provided by the city. A deposit of $2,000 is required for the meter and backflow prevention device to connect to the hydrant.

2. Temporary Water Service. The fee for temporary water service is $150.00 for each two weeks of temporary service without a meter, payable in advance.

3. Weber Drive Bulk Water Station. Bulk water sales through the Weber Drive water station shall be set at a rate of $0.03 per gallon with a $5.00 minimum charge per transaction.

C. In addition to usage charges under subsection (A) of this section, water customers shall pay the following facility charges to recover the cost of water system capital improvements:

1. Each customer who receives water service through an existing private or public water system that is taken over by the city shall pay an additional facility charge of $11.45 per month in lieu of off-site assessments and for other improvements that benefit individual lots. This facility charge shall be payable from the date that the city takes over the existing system until an amount has been paid for each premises receiving service through the existing system that is equal to the amount calculated for an off-site assessment in the manner provided for Assessment District 78-1. Where water service through such an existing system is available to a property that is not connected to the system, connection of the property will be conditioned on payment of the facility charges that otherwise would have accrued under this subsection to the date of connection. (Ord. 16-11 § 2, 2016; Ord. 13-15(AM) § 2, 2013; Ord. 09-52 § 2, 2009; Ord. 04-41(AM) § 2, 2004; Ord. 03-18(AM) § 10, 2003; prior code § 5.10.080)